Workbench Professional

Professional Workbench

Hanging Cabinet | WBS(1500mm)

SHARE
  • Wood top, laminate top and rubber top

    Workbench-top

    Wood top, laminate top and rubber top.
  • Hanging cabinet

    Hanging cabinet

    45kg load capacity per drawer.
  • 600kg load capacity

    600kg load capacity

     
  • Perforated boards

    Perforated boards

  • Shelf

    Shelf

  • Universal socket

    Universal socket

Anti-static mat

Anti-static mat

Anti-static mat is optional,
includes 2 snaps and 1 grounding wire.
RoHS 2.0 compliant
Surface resistance: 10⁷ – 10⁹ Ω
 
Wood top, laminate top and rubber top

Step.1       

Workbench-Top

  • Wood top(W)

    Wood top(W)

    Finger-jointed rubber wood to ensure high durability.
    Features:High temperature resistance, grease and chemical resistance.
    Tool makers, equipment maintenance.
     

     
  • Rubber top(N)

    Rubber top(N)

    High density fiberboard(HDF) covered with green rubber mat on top and PVC protection on four edges. 
    Features:High impact strength.
    Machine maintenance, normal factories, production line and garages.
     
  • Laminate rop(F)

    Laminate top(F)

    Plywood top covered with gray laminate and PVC protective edges, great performance in high temperature environment.
    All electronics companies, research labs, hospitals, workshop and metrology department.
02A
 

Step.2       

Drawer/Cabinet

03A

Step.3

Panel Set   

04A

Step.4       

Accessories  

DIY product, Made in Taiwan
Model No. WBS-53022□
□ : Workbench-Top → 
WBS-53022N
Rubber top(N), Laminate top(F)
Rubber wood top(W)
WBS-53022N Professional Workbench
Model No. WBS-53022□
Workbench-top: N / F / W 
Dimensions: W1500xD750xH800mm
Material: Steel
WBS-53022N2 Professional Workbench
Model No. WBS-53022□2
Workbench-top: N / F / W 
Dimensions: W1500xD750xH1400mm
Material: Steel
Panel Set: Perforated Board
WBS-53022N3 Professional Workbench
Model No. WBS-53022□3
Workbench-top: N / F / W 
Dimensions: W1500xD750xH1400mm
Material: Steel
Panel Set: Perforated Board+Shelf
WBS-53022N4A Professional Workbench
Model No. WBS-53022□4A
Workbench-top: N / F / W 
Dimensions: W1500xD750xH1400mm
Material: Steel
Panel Set: Perforated Board+

                       Socket
※ Power plugs not included

WBS-53022N5A Professional Workbench
Model No. WBS-53022□5A
Workbench-top: N / F / W 
Dimensions: W1500xD750xH1400mm
Material: Steel
Panel Set: Perforated Board+

                       Shelf+Socket
※ Power plugs not included

WBS-53022N6A Professional Workbench
Model No. WBS-53022□6A
Workbench-top: N / F / W 
Dimensions: W1500xD750xH1400mm
Material: Steel
Panel Set: Perforated Board+

                       Shelf+Socket+Light
※ Power plugs not included

People Also Viewed

Professional Workbench

Standard | WB(1500mm)

Professional Workbench

Standard | WB(1800mm)

Professional Workbench

Drawers | WBT(1500mm)

Professional Workbench

Drawers | WBT(1800mm)

Professional Workbench

Tool Cabinet | WB(1500mm)

Professional Workbench

Hanging Cabinet | WBS(1500mm)

Professional Workbench

Hanging Cabinet | WBS(1800mm)

Professional Workbench

Tool Cabinet | WB(1800mm)

Inquiry List

Total of 0 products

    產品比較

    你的比較總計0件產品

      Search

      Please Enable cookies to improve your user experience

      In accordance with the European Union's implementation of the General Data Protection Regulation (GDPR), we are committed to protecting your personal data and providing you with control over your personal information. We have updated and will regularly update our privacy policy to comply with this data protection regulation. Please refer to our latest Privacy Statement.
      This website uses cookies to provide a better browsing experience. For more information on how this website uses cookies, please follow the link.